Dauphin Relief Road

The Dauphin project required the design and construction of a number of walls and bridges.



  • Removing the old concrete and bituminous pavement for the reconstruction of Erie Street in Dauphin B
  • Excavating and hammering rock at the Mt. Pleasant Road intersection with old Route 22/322 to begin c